
Complete microcement system
Provide different construction paths for walls, floors and continuous spaces, from base and bottom layers to finishes and protective layers.
The traditional system direction of on-site preparation requires strict control of proportions, layers and construction conditions.
To reduce the variables of on-site weighing and water addition, it is still necessary to complete the base layer, reinforcement and protective layer judgment.
It is used for special touch and decorative direction. The specific applicable position can be confirmed with the current product information.



