Skip to Content

Space requirements / 01

The overall continuous space,
How should materials be selected?

First confirm the wall or floor, dry area or wet area, frequency of use and maintenance requirements, and then combine microcement, artistic coatings and protection systems to avoid selecting products based on renderings alone.

  • wall to floor continuous
  • Less patchwork
  • wet and dry zone
  • Maintenance requirements

Real Project / 02

final effect,
From the cooperation of every layer.

Whether a continuous surface is stable depends on base strength, crack and joint treatment, material hierarchy and construction control. Let’s judge the site conditions first, and then talk about color and final effect.

  • Grassroots testing
  • Crack treatment
  • construction level
  • On-site acceptance

Color texture / 03

the same color,
It will also be redefined by light.

The depth, scraping direction and gloss of decorative paint will change with lighting and lighting. Color selection can’t just look at the screen, it needs to be combined with physical templates, spatial orientation and on-site lighting.

  • Entity template
  • Space lighting
  • Scraping direction
  • Gloss change

Part 2/Brands and Systems

First understand the space requirements,
Then choose the brand.

There is no absolute level of brand, only the product direction and applicable conditions are different. Click on a brand to see what it’s responsible for, what space it’s suitable for, and what you need to confirm before choosing.

View all product systems
The actual effect of microcement continuous walls, floors and curved surfaces in rest spaces
Actual project shots/continuous wall, floor and curved surface applications

Spain / Microcement Systems

TOP PROJECT

Complete package from base layer to protective layer

Mainly responsible for

CLASSIC two-component, READY ready-mixed, READYCORK oak pellets, as well as primers, resins, sealing and protection systems.

Prioritize

Residential wall-to-floor continuity, updating of older spaces, less patchwork surfaces, and projects that require comparison among multiple microcement paths.

Confirm before selecting

Substrate stability, wall or floor, dry or wet area, frequency of use and final protection requirements.

  • wall to floor continuous
  • Ready-mixed / two-component
  • Complete construction level
Enter microcement product introduction
Selection principle

Multiple brands can be combined in the same space: continuous walls, artistic background walls, mineral interior walls and high-strength floors do not need to be covered by one brand.

Assist in selection based on project conditions The specific agency, supply, inventory, batches and scope of application are subject to the valid information at the time of project consultation.

03 / Wall Diagnosis

Read the wall first,
Then choose a color.

Cracks, alkali, mildew and water seepage are only superficial signs. First determine the moisture, base and structural conditions before deciding whether to proceed with decoration construction.

Click on the problem anchor point on the wall to view the preliminary judgment path.
Interactive concept wall with cracks, alkaline bubbling, traces of water seepage and localized mildew spots
Interactive concept wall / for diagnostic process demonstrationsNot real project evidence, final conclusion requires on-site testing
wall anatomy roomClick on the left anchor point to switch the problem

01 / cracking

This crack,
Is it still changing?

Stop covering construction first

Base shrinkage, inadequate joint preparation, and structural movement can all manifest as cracks. You can't tell if it's stable just by looking at a photo.

Check first
Mark the crack width and observe the change, also checking for hollows, seams, and sides for movement.
risk boundary
When there are active cracks, penetrating cracks or significant displacement, decorative materials cannot replace the structural treatment.
Suggested processing logic
  1. Determine whether it is active
  2. Stable base
  3. partial repair
  4. Grid enhancement
  5. Choose a finishing system

This is not a conclusion drawn online. It first helps customers know: what information must be completed and what construction cannot be started in a hurry.

Submit on-site photos and grassroots conditions

04 / Real case

From the finished effect,
See the surface formation process.

A credible case should document the original space, grassroots judgment, material selection, construction levels, finished results and subsequent maintenance.

Click the observation angle on the photo to switch between three real shots of the same project, and distinguish visible facts from information to be verified.
Overview of commercial space cases, showing continuous curved surfaces, display areas and circular commercial circulation lines
Real shots of complete projects/commercial space cases AAll three angles are from the same project folder

Case evidence chain

A complete case consists of six types of evidence.

Actual shots of completed sets of the same project are currently confirmed; the rest of the information will not be inferred based on photos, file names or visual effects.

  1. 01
    original spacePhotos and space conditions before renovation
    Not included
  2. 02
    Grassroots judgmentType, stability and hydration state
    Not included
  3. 03
    Material and color numberBrand, system and physical samples
    Not included
  4. 04
    construction levelPrime, enhance, finish and protect
    Not included
  5. 05
    Finished effectReal photos taken from multiple angles of the same project
    Checked
  6. 06
    Use and maintenanceCleaning methods and follow-up visits
    Not included

A set of completion photos is still not equivalent to a complete technical case. The current archive only presents verifiable completion images; after obtaining the original construction records, base layer, material, node and maintenance information will be added.

View all case files